Previous Lecture Complete and continue  

  Why the Control Chart is Used for Capacity Management

  • Control Chart has the ability to uncover some hidden trends and patterns of systems performance data
  • Control Chart is a really proactive tool and could capture unusual resource usage before something breaks
  • Control Chart is the best base-lining tool and can show how actual data deviate from historical baseline
  • Control Chart provides dynamic threshold: no need for manual settings
  • Control Chart is the tool to detect a workload pathology (run-away, memory leaks and other)